Technical Order EPR Bullets


- Authored 64 TI/TO updates; moderniz'd procedures f/$190M sys--harden'd int'l treaty monitoring msn f/11 COCOMs

- Led TO distribution pgm; managed 41 accounts/72 publications--ensured 100% AFI compliant f/$2.5M wx sys testbed

- Overhauled TODO prgm; revised/ordered/refurb'd 13 TCTO files/47 ACPINS/14 Secret TOs--avoided 74 QA errors


Technical Order Distribution Assistant (TODA)

- Actualized Grp's 1st electronic TO operations; eliminated posting errors/2K physical TOs--99% digital access

- Blueprinted Moody TODA trng prgm; created 5 how-to guides/12 tasks--ACC/A4 adopted documents as HAF policy

- Demonstrated highest level of technical competence--maintained over 120 training aircraft technical orders

- Effectively managed 123 technical orders--zero defects noted on recent squadron self assessment inspection

- Fresh thinker--established new procedures for controlling 180 technical orders--all changes posted on time

- Integrated electronic technical manual system into four courses--eliminated 280 updates for 1,500+ technical orders

- Maintained 280 TOs--posted 38 changes and relabeled all--ensured guidance/procedures current and accurate

- Managed ISO sections technical order program--increased Quality Assurance pass rate from 50% to 86%

- Managed unit TODA prgm; ensured serviceability/updated 64 etools--supported daily tech data compliance, 400 prsnl

- Managed technical order prgm; maintained/updated 165 mx instructions--no discrepancies during sq inspection

- Masterminded Grp's T.O. strategy; distributed over 25K Tech Data Updates, 150 TCTOs, enabl'd execution of $77M FHP

- Oversaw 305 explosive time changes/$101K; validated docs/ensured record accuracy--drove 99% MSE rate

- Performed 110 MIT insps; ID'd error w/ TO update procedures/directed mx of MITs--raised 71% FMC rate to 100%

- Pioneered 1st COPE iPad program, repurposed 60 obsolete eTools, saved $94K & delivered mobile NIPR to 4 Sq's

- Prepared the Wing's $1B CSAR fleet for future near peer competition--exemplified the CSAF's Action Orders

- Refurbished 150 classroom technical orders--ensured accurate data and superb condition of training materials

- Resolved 121 HH-60W Combat Rescue Helicopter Deficiency Reports; id'd & recovered $2.5M in faulty equipment

- Resurrected improperly managed TO program--contributed to "Excellent" rating during 2004 HQ AETC ORI

- Reviewed/submitted tech order/publication change recommendations; tracked/reported flt eval trends to 31 OG

- Revived crippled, neglected T.O. program--updated, increased accuracy 50%, reduced number of TOs by 25%

- Sought & completed TODA CBT course--improved mgt & control of sec's TOs, ensured complete/accurate file

- TODA monitor--completed online course--scored 87%--knowledge ensured current technical publications

- Team chief on C-130 chine angle Time Compliance Technical Order--aircraft returned to flying 8 hours early

- Technical Order Distribution Accountant--inventoried/repaired 52 TOs--zero defects on followup inspection

- Vigilant Technical Orders Distribution Account Monitor--rebuilt over 800 technical orders--ensured accuracy

- Finished CSA trng; set-up BAF F-16 ETOOL; 2 cabinets online/20 CPUs imaged--cut need for 1K paper TOs


Time Compliance Technical Order (TCTO)

- Directed 3-yr wing spar TCTO; restored 9 flaperon brackets, c/w < 2-yrs--svd $1.7M/96-hrs in wing changes

- Directed rocket catapult union TCTO; accomplished 49 insps 1 year ahead of sched--ensured fleet/pilot safety

- Drove engine TCTO; trn'd 9 techs/eval'd 1.6K blades--boosted qualifications 56%/safeguarded $170M assets

- Energized 1-yr mx stand TCTO; drove 20 safety gate assy modifications--fleet 100% OSHA compliant <6 mos

- Expedited 90-day engine TCTO; fleet 100% c/w < 3 wks--key to Wg's General Creech Mx Excellence Award

- Expedited NC2 TCTO upgrade; overhauled crypto assets--strengthened wg CC's pri EAM circuit for CJCS ops

- Managed 3-tr wg spar TCTO; svd $7.8M/fleet 80% c/w <1.5 yrs--fostered USAFE's '13 Gen Creech Awd win

- Maximized a/c downtime; consolidated 5 TCTOs/21 TCIs/2,400-hr insp into Phase flow--saved wing 124 hrs

- Spearheaded 2-yr eng shroud TCTO; prevented possible fire damage to $586K resources--Wg 43% c/w < 1 yr



Enter contributions below and click Send. Thanks!